DETAILED DESIGN, PROCUREMENT, TRANSPORT TO SITE, INSTALLATION, TESTING AND COMMISSIONING OF A HOPPER AERATION SYSTEM, DUST HANDLING PLANT (DHP) AND CONDITIONING PLANT AT TUTUKA POWER STATION.

Country: South Africa
Language: EN
Number: 8160426
Publication date: 01-03-2018
Source: Eskom
Tags: Transport

Description

Full information on the tender is closed.
For further work with the site read the information below.

About us

Leading searching system of world tenders

  • Largest database of tenders and sources of procurement of the World
  • Free daily mailings according to Your settings
  • Winners information
  • Convenient display and downloading of information

Choose us

Getting Started

After site registration, this functions will be available to You

  • Subscription to free mailing list for your keyword phrases
  • Tenders announcements previews
  • Download summary information in Excel format
  • View information about tender winners, suppliers and customers

REGISTER

For using all functions of our site and view full information you need to register a commercial account

  • Selected period
  • Pay access in any of the possible ways

Pay

Other tenders from South Africa за for this period

Cleaning and gardening services at Apollo Substation on a full time basis for a period of 36 months. Source: Eskom

MANUFACTURE, TESTING, SUPPLY, DELIVERY, OFF-LOADING, ERECTION, COMMISSIONING AND TRAINING OF ESTIMATED QUANTITIES OF 220kV TO 765KV DISCONNECTORS AND EARTHING SWITCHES FOR TRANSMISSION AND GROUP CAPITAL DIVISIONS ON AN “AS AND WHEN” REQUIRED BASIS FOR A 4 (FOUR) YEAR PERIOD Source: Eskom

33kV, 66kV and 132kV Circuit Breakers Source: Eskom

The Refurbishment of Eskom Garankua HUB Source: Eskom

MANUFACTURE, TESTING, SUPPLY, DELIVERY, OFF-LOADING, ERECTION, COMMISSIONING AND TRAINING OF ESTIMATED QUANTITIES OF 275KV TO 765KV CIRCUIT BREAKERS FOR, TRANSMISSION AND GROUP CAPITAL DIVISIONS ON AN “AS AND WHEN” REQUIRED BASIS FOR A 4 (FOUR) YEAR PERIOD Source: Eskom