Provision of the Repairs on various Switchgear items from 6.6kv- 33kv and from 44kv -132kv over a period of 3 years in Gauteng Operating Unit. Follow-up Clarification Meeting - Date: 08/03/2018, Time: 09:00am, Venue: Eskom Centre, 204 Smit St, Braamfontein. Parking: Cnr. Harrison & Wolmarans; if full, use Parktonian Hotel Parking at your cost.

Country: South Africa
Language: EN
Number: 8160425
Publication date: 01-03-2018
Source: Eskom

Description

Closing Date & Time Summary Published Date Description Modified Date Office Location Document(s) View
04-Apr-2018 10:00 Provision of the Repairs on various Switchgear items from 6.6kv- 33kv and from 44kv -132kv over a period of 3 years in Gauteng Operating Unit. Follow-up Clarification Meeting - Date: 08/03/2018, Time: 09:00am, Venue: Eskom Centre, 204 Smit St, Braamfontein. Parking: Cnr. Harrison & Wolmarans; if full, use Parktonian Hotel Parking at your cost. 16-Feb-2018 16:36 Provision of the Repairs on various Switchgear items from 6.6kv- 33kv and from 44kv -132kv over a period of 3 years in Gauteng Operating Unit. Follow-up Clarification Meeting - Date: 08/03/2018, Time: 09:00am, Venue: Eskom Centre, 204 Smit St, Braamfontein. Parking: Cnr. Harrison & Wolmarans; if full, use Parktonian Hotel Parking at your cost. 01-Mar-2018 15:42 Eskom Holdings SOC Limited Eskom Megawatt Park Tender Office Northside Maxwell Drive No. 01 Maxwell Drive Sunninghill, Gauteng 18 Documents

Other tenders from South Africa за for this period

DETAILED DESIGN, PROCUREMENT, TRANSPORT TO SITE, INSTALLATION, TESTING AND COMMISSIONING OF A HOPPER AERATION SYSTEM, DUST HANDLING PLANT (DHP) AND CONDITIONING PLANT AT TUTUKA POWER STATION. Source: Eskom

Cleaning and gardening services at Apollo Substation on a full time basis for a period of 36 months. Source: Eskom

MANUFACTURE, TESTING, SUPPLY, DELIVERY, OFF-LOADING, ERECTION, COMMISSIONING AND TRAINING OF ESTIMATED QUANTITIES OF 220kV TO 765KV DISCONNECTORS AND EARTHING SWITCHES FOR TRANSMISSION AND GROUP CAPITAL DIVISIONS ON AN “AS AND WHEN” REQUIRED BASIS FOR A 4 (FOUR) YEAR PERIOD Source: Eskom

33kV, 66kV and 132kV Circuit Breakers Source: Eskom

The Refurbishment of Eskom Garankua HUB Source: Eskom